Babcock has solid expertise in providing civil engineering
support services to the rail sector since 1996.
We are extremely proud to offer a highly efficient in-house
civil engineering team that can be supplemented at any time in
order to meet the specific needs of our clients.
Core service features and client case studies are outlined
below. If you require any further information, or wish to discuss
your individual requirements in more detail, please do not hesitate
to get in touch.
Core service features:
- Railway and highway bridge design, assessment and
refurbishment
- Retaining walls and structures
- Lineside routeworks and cabling
- Foundations and Hardstandings
- Structural Inspection/repair/refurbishment
- Repair/construction of Railway Platforms
- Lift shafts/Stairwells: access points
- Drainage works of all types: Analysis, Design and Construction,
including Rail
Works include:
South Erewash project
GSMR
FTN
Tapton
See Case Study for more detailed examples.
Case Study:
South Erewash
As part of the South Erewash project, Rail Division recently
erected the third largest signal gantry in the rail network, under
track crossings, under road crossings, retaining bases for DNOs,
REBs, location cases, thousands of metres of toughing routes,
reinforced concrete bases, removal of signals and signal gantries.
This contract is valued at £16m supporting Westinghouse.
Civils works
We are undertaking a variety of civils works to support our
Signalling, Telecomms and Power Systems projects. As part of the
Glasgow Central works the Project delivered two new access points,
one of which was a major lift shaft/stairwell in the approach to
Central in between 12 operational lines. Structural steelwork
repairs and modifications were carried out to Signal gantries,
signal posts and signal droppers to accommodate new equipment. REB
bases, UTXs and troughing were all installed. Two new buildings
were constructed to house signalling equipment and an existing
listed building was refurbished.
GARL Elderslie Loop
We are currently undertaking the installation of bases for OLE
masts and equipment. Earthworks/Embankment work is to be carried
out to allow new alignment of P-Way. Access walkways; fencing and
extended hardstanding for lorries are all within the remit.